Copyright © 2021
Po Valley Energy Limited
All rights reserved.
Po Valley Energy Limited
All rights reserved.
November 15, 2011
Po Valley Energy (ASX:PVE) wishes to provide the market its second Drilling Status Report for the Vitalba1dirA well in the Cascina Castello concession.Time of Report | 12:00 Italy time |
Well Depth | MD 770 metres |
Current Operation | Milling 7” casing |
Forward Operation | Preparing whipstock at 540 MD metres for kickoff of new sidetrack, open window in 9”5/8 casing and drilling ahead the 8”1/2 phase |